Short answer
How do frame rate, speed and duration relate?
For an unchanged frame count, elapsed seconds equal frames divided by playback fps. The fractional rate families include 24, 30 and 60 divided by 1.001.[1] Our original example retains 1440 pictures: 24 fps gives 60 seconds, while 25 fps gives 57.6 seconds. The speed ratio is 25/24; the duration ratio is its reciprocal. This sheet states its full-rate 59.94 counting convention separately and does not specify how a device packs high-rate timecode.
Sources and scope
- ITU-R BT.709-6 (06/2015)Introduction, printed p. 2: integer and /1.001 picture-rate families.
Exact rates and label counts
| Rate label | Exact fps | Nominal N | DF skips* |
|---|---|---|---|
| 23.976 | 24000/1001 | 24 | Not offered |
| 24 / 25 / 30 | 24 / 25 / 30 | 24 / 25 / 30 | Not offered |
| 29.97 | 30000/1001 | 30 | 2 |
| 48 / 50 / 60 | 48 / 50 / 60 | 48 / 50 / 60 | Not offered |
| 59.94 | 60000/1001 | 60 | 4 |
Frame-preserving conforms
| Change | Frames | Source to new seconds | Speed |
|---|---|---|---|
| 24 to 25 | 1440 | 60.000 to 57.600 | 104.1667% |
| 24 to 23.976 | 1440 | 60.000 to 60.060 | 99.9001% |
| 25 to 29.97 | 1500 | 60.000 to 50.050 | 119.8801% |
| 48 to 24 | 1440 | 30.000 to 60.000 | 50.0000% |
Counting and interpretation
- * DF skips opening labels at each minute except every tenth minute; no pictures are removed. At 29.97: 00:00:59;29 -> 00:01:00;02. At full-rate 59.94: 00:00:59;59 -> 00:01:00;04.
- Elapsed seconds = frame count / exact fps. NDF label seconds at a fractional rate are not physical elapsed seconds.
- Speed ratio = playback rate / source rate. Duration ratio is its reciprocal. These conforms retain all source frames; a duration-preserving standards conversion needs a different picture policy.
- 1080i/59.94 commonly denotes 59.94 fields and 29.97 frames per second; 1080p/59.94 denotes 59.94 whole frames. PsF divides one progressive picture into two segments. Confirm the delivery notation.
References and assumptions
Read the full guide for context and further primary references. These are explanatory planning references, not a replacement for the job's delivery requirements.